Bolli focuses on Vision Fluid
BOLI, FOCUS ON VISION‑BASED FLUID DISPENSING
Search All
BOLI, FOCUS ON VISION‑BASED FLUID DISPENSING
Bolli Automation dispensing technology column, continuously updating vision dispensing machine selection, parameter debugging, glue valve matching, takt calculation, defect troubleshooting, etc. practical dry goods, helping electronics manufacturing engineers avoid detours, sharing source-factory frontline experience.
起收点堆积and 缺口查dispensing时序:开胶延时、关胶提前量、抬针速度,一次调一个。
Read full articlethe dispensing line width is baselined by the needle inner diameter, adjusted through the coordination of pressure, speed and standoff height, and verified by actual measurement on a test piece.
Read full articleglue interruption at start and stringing at the end are mostly caused by glue open/close timing parameters not keeping up with the motion speed; troubleshoot lead and delay separately.
Read full articleJitter and misfires tracking large equipment mean electrical interference; troubleshoot via grounding, wiring, shielding, and sectioned power-down.
Read full articleA UV LED curing lamp must be matched to the adhesive photoinitiator's absorption wavelength: short wavelengths cure the surface, long wavelengths penetrate deeper, intensity and time are considered together, and changing the adhesive type requires re-verification.
Read full articlewhen a whole batch deviates in the same direction during follow dispensing, check three points in order: synchronization signal, belt slipping, and image-capture triggering; a program problem can be ruled out first.
Read full articleTroubleshoot piezoelectric valve dispensing problems in the order of nozzle, seal ring, bubbles, and signal; the daily focus is on cleaning residual adhesive, washing the flow channel, and replacing the seal ring.
Read full articleseal ring failure causes valve stem sticking and seepage. Select material by adhesive, replace at over 15% compression set, check compatibility when changing adhesive, and forbid forced prying and dry firing.
Read full articleDispensing-volume drift after a batch change is mostly due to normal inter-batch viscosity differences and filler settling. After distinguishing batch from equipment problems, confirm by trial-dispensing ten dots and weighing, fine-tuning pressure or valve time in small steps, and recording it; for adhesive change, degas and pre-press, and use up within 24 hours of opening.
Read full articlevision dispensing machine image graying is mostly light source dust and LED brightness decay. handle it in four steps: clean, brighten, compensate with exposure light gain, and replace the light source; run daily in mid-low levels and record grayscale routine inspection; decay is a gradual process, and only with records can it be scheduled in advance...
Read full article