Bolli focuses on Vision Fluid
BOLI, FOCUS ON VISION‑BASED FLUID DISPENSING
Search All
BOLI, FOCUS ON VISION‑BASED FLUID DISPENSING
Bolli Automation dispensing FAQ summarizes high-frequency questions and troubleshooting methods for vision dispensing machine selection, adhesive-valve matching, stringing and glue break, unstable accuracy, and bubble entrainment, helping engineers quickly locate and solve on-site dispensing problems.
起收点堆积and 缺口查dispensing时序:开胶延时、关胶提前量、抬针速度,一次调一个。
Read full articlethe dispensing line width is baselined by the needle inner diameter, adjusted through the coordination of pressure, speed and standoff height, and verified by actual measurement on a test piece.
Read full articleglue interruption at start and stringing at the end are mostly caused by glue open/close timing parameters not keeping up with the motion speed; troubleshoot lead and delay separately.
Read full articleJitter and misfires tracking large equipment mean electrical interference; troubleshoot via grounding, wiring, shielding, and sectioned power-down.
Read full articlewhen a whole batch deviates in the same direction during follow dispensing, check three points in order: synchronization signal, belt slipping, and image-capture triggering; a program problem can be ruled out first.
Read full articleTroubleshoot piezoelectric valve dispensing problems in the order of nozzle, seal ring, bubbles, and signal; the daily focus is on cleaning residual adhesive, washing the flow channel, and replacing the seal ring.
Read full articleseal ring failure causes valve stem sticking and seepage. Select material by adhesive, replace at over 15% compression set, check compatibility when changing adhesive, and forbid forced prying and dry firing.
Read full articleDispensing-volume drift after a batch change is mostly due to normal inter-batch viscosity differences and filler settling. After distinguishing batch from equipment problems, confirm by trial-dispensing ten dots and weighing, fine-tuning pressure or valve time in small steps, and recording it; for adhesive change, degas and pre-press, and use up within 24 hours of opening.
Read full articlevision dispensing machine image graying is mostly light source dust and LED brightness decay. handle it in four steps: clean, brighten, compensate with exposure light gain, and replace the light source; run daily in mid-low levels and record grayscale routine inspection; decay is a gradual process, and only with records can it be scheduled in advance...
Read full articlefirst-piece confirmation must be redone after vision dispensing machine model change, material change, parameter adjustment, or restart after machine shutdown. verify in five steps by program version, material, fixture, process parameters, and product measurement; release with sign-off under the three-inspection system; retain qualified first-pieces as samples until the end of the batch as a comparison baseline.
Read full article