after changing the model and adjusting the machine, releasing directly to production often causes a whole batch of problems. what first-piece confirmation does is toblock risks before mass production- what is inspected is not just one product, but whether the current production conditions can stably produce qualified products.called first-piece inspection in the quality system, usually executed per the three-inspection system in the factory。
redo whenever any factor affecting the result changes:shift change, operator change, adhesive change, material change, fixture adjustment, program or parameter change, restarting the machine after shutdown, drawing/document revision. industry materials summarize this as“person machine material method environment measurement”any element change. vision dispensing machine model change happens to cover all these elements - the program changed, parameters adjusted, and fixtures may have moved; none can be omitted.

confirmation order from document to product: first verify whether the program version and parameter card are the current valid version; the most common root cause of batch defects isthe old program was not fully cleared; then re-checkadhesive brand and batch, Vision positioning status; then forprocess parameters- air pressure, time, and needle gauge must match the process document; finally checkthe product itself. take one to three first-pieces, record measured values of key characteristics; measure and record glue line width, dot size, and position deviation; do not just write the two words ”qualified”.
the three-inspection system is operator self-check, team leader mutual inspection, inspector special inspection, only release to mass production after all three gates pass. for self-check, seewhether the equipment runs smoothly, dispensing stable; mutual inspection and recheckparameters and operations method; the special inspection followsfile review and sign-off. when Bolli delivers equipment, this model-change first-piece process is written into training, and operators follow the table. qualified first-pieces must be clearly marked and retained as samples until the end of the batch; if the status is suspected to have changed midway, take them out for comparison. the first action for a non-conforming first-piece is to stop the batch, identify the cause, and redo the three inspections after resolution; do not adjust while in production.

do not treat the first-piece record as a formality table; it is the quality reference for this batch of products. how to classify and count defects when found,the article on defect classification and statistics has been written; how to analyze and improve defects when they appear,you can read the article on defect analysis and improvement next. the higher the model-change frequency of Vision automatic dispensing equipment, the more first-piece confirmation must be executed thoroughly; a few minutes of confirmation replaces the risk of reworking an entire batch. for training supporting model change, machine adjustment, and first-piece confirmation, you can contactBolli Automation Co., Ltd.13352947677。
source statement: for the trigger conditions of first-piece inspection, the three-inspection process, and record requirements, refer to the ZhuoYue Quality Think Tank FAI Practical Guide for First-Piece Inspection (zhiliangclub.com), the KePu China first-piece inspection entry (kepuchina.cn), and the Chifa Electronics PCBA first-piece inspection practice (smtbar.com), retrieved November 2026.