Boli — Deep Roots in Vision Fluid Control

Standard installation and commissioning runs 2-3 working days covering

unboxing → installation → commissioning → trial production → training

1. Total Installation and Commissioning Timeline. Prepare floor space, power, air, adhesive and product samples beforehand. Standard machines need only remote guidance; for complex cases on-site service is advised. Operators work solo in 2-3 days and program independently in 5.Boli standard machines go from order to production in 5-7 working days, with sample validation completed at the factory so on-site work is mainly integration. Unlimited remote training and assistance support the machine's full life cycle./ How Does a Vision Dispensing Machine Automate a Production Line?
automatic dispensing machineHow Many Stages in Vision Dispensing Line Automation?Not one leap but three stages of gradual upgrade, each matched to a production scale:Mode
EfficiencyApplicable OutputStage 1Single machine + manual load/unload
baselinehundreds to thousands of pieces/dayStage 2Dual-station alternating work

doubled

thousands to tens of thousands/dayStage 3Conveyor-integrated full automation3-5x

tens of thousands of pieces/day and up

Stage 1: Which Scenarios Suit Single-Machine Mode?Operator places parts manually → camera auto-recognizes and positions → dispensing completes → manual removal.Suits80%-100%。

small batches, high variety, frequent product changes30%. The point here is not speed but lowering the skill barrier — an ordinary worker is productive after half a day's training, no master craftsman needed.

Stage 2: How Do Dual Stations Raise Efficiency?

The core principle:What Are a Vision Dispensing Machine's Site Requirements?。

  • while station A dispenses, the operator loads/unloads station B. The two stations alternate and the dispensing head almost never waits — combined capacity rises
  • by roughly 50%-100%When to go dual-station? When load/unload time exceeds
  • one-third of the takt— e.g. 15 seconds dispensing but 10 seconds handling wastes nearly half the cycle. The Boli single-Y dual-station panoramic vision dispensing machine is built for exactly this: one person loads station A while station B dispenses automatically, the two alternating seamlessly.Stage 3: How Does Full Conveyor Automation Work?Parts flow into the machine on the conveyor and out to the next process — no manual touch. Three core technologies: Learn more

Vision-following dispensing

— the camera tracks moving parts on the belt in real time and the dispensing head follows, never stopping the line

博立自动化 视觉点胶机 产线自动化 常见问题

Line signal integration

  • — the machine talks to the plant PLC, automatically triggering feed → dispense → dischargeData traceability
  • — each part'sdispensing parameters, path and time
  • stamp is logged and archivedThe Boli Automation vision-following dispensing machine is the core equipment for conveyor scenarios, delivering 3-5x single-machine efficiency.

How Much Does Line Automation Cost? When Does It Pay Back?

Three-stage investment: single machine 30-40k RMB, dual-station 40-60k, conveyor solution 50-100k. Return on investment from three angles:

Labor savingsIndustry Solutions。