Search All

Bolli focuses on Vision Fluid

BOLI, FOCUS ON VISION‑BASED FLUID DISPENSING

How to arrange the dispensing path sequence of vision dispensing?

same station, same set of points,which to dispense first and which later often yields different results. This is the most easily overlooked item — everyone focuses attention on glue volume and position, but no one manages the sequence; only when the product has problems do they go back and fix it.

I. Why Order Affects Results

First,Adhesive dispensed first blocks the path. The positions that still need to be traversed later — if glue has already accumulated in front, the needle or nozzle may smear against it, dragging and smudging the glue line and contaminating other stations.

Second,the first dispensed pieces show more time variation—leveling, infiltration, or already starting surface drying all make the before-and-after states inconsistent.

Third,Start-stop positions leave marks, the start and end points are often where glue accumulation or tailing is most likely.

II. Several Practical Principles

First isInside before outside. First do the enclosed, inner-positioned ones, then the outer ones, to avoid the needle's later pass scraping already-dispensed adhesive.

second isFirst dispense the positions that will be shielded, the places that later processes will cover—dispensing first is safer than later.

third isHide the start/stop dispensing points in concealed places, placing them in sections that affect neither appearance nor function.

fourth iszoned operations, from near to far, reduces empty travel and also benefits cycle time. Fifth isdon't arrange points too densely, when spacing is too dense, rather go in two passes to avoid previously dispensed adhesive affecting the next point.

vision dispensing machinedispensing路径,走胶顺序:先内后外、分区operations、由近及远

III. How sequence and equipment coordinate

To avoid scraping already-dispensed stations, prioritizenon-contactsolution — Bolli's pneumatic jetting valve can operate non-contact within a 0.5-1cm height difference, and is less afraid of smearing the adjacent glue than contact type. Glue collection relies onsuck-back valve, at the instant of glue stop, suck-back prevents stringing and tailing, avoiding glue filaments flung to the next point. The heights of different segments can be set separately by point and by segment in the program, with Vision recognizing boundaries to establish a reference; after the whole sequence is determined, save it as a template and call it directly when switching models.

IV. Implementation Recommendations

It is recommended to treat the order as a process parameter; while at BolliFree Samplingarrange several groups of different sequences for actual testing, compare overflow, stringing, and takt, then finalize and write into the operations file. Bolli provides unlimited remote after-sales and training; for stations afraid of smearing, equip non-contact jetting valve and suck-back valve for glue collection; once the whole sequence is set, save it as a template. To compare the effects of several sequences, contact Bolli:13352947677。

单yPanoramic vision dispensingmachine-左视图
How to Adjust the Z-Axis Height of a Dispensing Machine? Previous: