Search All

Bolli focuses on Vision Fluid

BOLI, FOCUS ON VISION‑BASED FLUID DISPENSING

How to implement SPC control in the vision dispensing machine dispensing process?

dispensing is different from stamping; it is not ”one strike makes one”-the adhesive amount and width slowly drift with temperature, viscosity, air pressure, and needle wear. Only watching the first piece and last piece, etc. by the time you find it wrong, a batch may have been made in between.

I. First define what to control

The first step in process control is to select key characteristics. common dispensing metrics: dot diameter, glue line width, adhesive amount, position deviation. Choosing the right characteristics makes the rest meaningful; too many metrics and no one measures. Each must havea consistent measurement method, otherwise the data are not comparable.

II. Control chart: distinguishing normal variation from anomalies

Plotplot data sampled at fixed frequency in time order, and draw control limits, you can see two things clearly: whether the data exceeds the control limits, and whether there is a continuous upward or downward trend. The common ”gradual” anomaly in dispensing-the adhesive amount slowly decreasing-can be seen in advance with a control chart, rather than etc. piling up defective products.

III. CPK: is the process capability sufficient

CPK compares the process fluctuation amplitude and the specification tolerance. A low CPK usually has two causes: excessive process fluctuation, or the center deviating from the spec center. First reduce fluctuation (fixture, parameters, routine inspection), then adjust the center; reversing the order causes repeated rework.

IV. Implementation sequence

The sequence is:First stabilize (reliable fixture positioning, fixed parameters, execution per routine-inspection sheet) -> then measure (unified method, calibrated measuring tools) -> then chart (control chart monitors the trend) -> then calculate capability (CPK)→ finally continuous improvement. Skipping the front and calculating CPK directly only yields a bunch of meaningless numbers. Also, CPK requires sufficient data volume; drawing conclusions from just a few pieces is unreliable.

vision dispensing machine治具定位,SPC管控

5. Summary

the value of dispensing process control lies in ”early detection of drift“, rather than picking out defects after the fact. Bolli supports saving parameters programmatically by model, together with the production line's self-built sampling records, making it easier to connect the data; to connect parameters with data, contact Bolli:13352947677。

How to Adjust the Z-Axis Height of a Dispensing Machine? Previous: